|

| |
November 2003
The internal structure consists of the bilge runner, inwhale, floors and
engine bearer.
Inhwhale and bilge runner are laminated of two strips of 15mm each, laminated in
situ. Before laminating them, I first put epoxy on the backside of the first
strip since you will never be able to get there with your brush once they are in
position.
The midsection, for carrying the engine and boiler.

March 21th 2004
The floors before mounting.
Above the pictures illustrate the problem if you want to mount the floors to
the frames, but the frames are not perpendicular to the keel. I chose to make
the frames perpendicular to the hull at the specific location of the frame. This
means that the more you come to the stem or the transom, the bigger the angle of
the frame to the keel. This makes t he frames much easier to make AND stronger.
The side effect is that one has to be a bit more creative to fit in the floor.
Sept. 2004, finishing of floors, start of interior
and steam plant
|